Close Menu
Next Online
    Facebook X (Twitter) Instagram
    • About Us
    • Contact Us
    • Content Transparency
    • Editorial Policy
    • Fact Checking Policy
    Facebook X (Twitter) Instagram Pinterest Vimeo
    Next Online
    • Home
    • News
    • National
    • International
    • politics
    • Tech
    • Game
    • campus
    • Entertainment
    Subscribe
    Next Online
    Home»News»Barapukuria Thermal Power Plant Resumes Production
    News

    Barapukuria Thermal Power Plant Resumes Production

    DMN DeskBy DMN DeskApril 25, 2026 6:22 AMNo Comments1 Min Read
    Share Facebook Twitter Pinterest LinkedIn Tumblr Reddit Telegram Email
    Share
    Facebook Twitter LinkedIn Pinterest Email


    0

    Production at Dinajpur’s Barapukuria Thermal Power Plant has resumed after a prolonged 48-hour shutdown caused by mechanical faults. The plant recommenced operation today, Friday (April 24).

    Last Wednesday (April 22), around 10 PM, Unit 1, with a production capacity of 125 megawatts, shut down. This halted production across all three units of the thermal power plant, leading to power outages in Dinajpur and 8 other northern districts.

    Prior to this incident, Unit 2, with a capacity of 125 megawatts, and Unit 3, with a capacity of 275 megawatts, of the same power plant had already been shut down for a long period.

    It is noteworthy that the coal-fired Barapukuria Thermal Power Plant was established next to the Barapukuria coal mine in Dinajpur in 2006, utilizing coal produced from the mine. Initially, two units, each with a production capacity of 125 megawatts, totaling 250 megawatts, were installed.

    Subsequently, in 2017, another unit with a 275-megawatt production capacity was launched, increasing the plant’s total capacity to 525 megawatts. However, due to mechanical faults and various other complexities, the power plant has never been able to produce electricity at its full 525-megawatt capacity simultaneously.



    Source link

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Previous ArticleAir Defense System Suddenly Activated in Tehran
    Next Article Two More Ships Arrive at Chattogram Port with Over 68,000 Tons of Diesel

    Related Posts

    News

    Today is Great May Day: A Day to Secure the Rights of Working People

    May 1, 2026 4:37 PM
    News

    ‘To prevent the election from being delayed, I signed the July charter’

    May 1, 2026 2:32 PM
    News

    Biman Bangladesh Airlines Finalizes Deal for 14 Boeing Aircraft

    May 1, 2026 10:14 AM
    Add A Comment
    Leave A Reply Cancel Reply

    Latest News

    Today is Great May Day: A Day to Secure the Rights of Working People

    May 1, 2026 4:37 PM

    ‘To prevent the election from being delayed, I signed the July charter’

    May 1, 2026 2:32 PM

    Biman Bangladesh Airlines Finalizes Deal for 14 Boeing Aircraft

    May 1, 2026 10:14 AM

    Working People are the Mainstay of the Nation: Prime Minister

    May 1, 2026 8:12 AM

    Weather Warning Issued for Dhaka and Across Bangladesh

    May 1, 2026 1:17 AM

    Gold Prices Further Reduced in Domestic Market, Effective Today

    April 30, 2026 10:09 PM
    ADS

    Archives

    • May 2026
    • April 2026
    • January 2026

    Categories

    • campus
    • Entertainment
    • Exam Updates
    • Game
    • International
    • National
    • News
    • politics
    • Results
    • Tech

    DMN Express

    The Daily Morning News Express (DMN Express) is an independent digital news platform that covers technology, education, and sports updates. Every day provides Breaking News on Exam Date to Result, the Latest and Upcoming Android or PC Games, Sports Updates, Highlights, and more.

    Type above and press Enter to search. Press Esc to cancel.